Personally I love oranges but cant stand orange juice.

  • neidu3@sh.itjust.worksM
    link
    fedilink
    English
    arrow-up
    4
    ·
    edit-2
    1 day ago

    Varies with installation type, age, and scale, but one common approach is to daisy chain the breakers via rails that carry each phase. I couldn’t find a good picture, but basically the rails and breakers are standardized so that a row of breakers will line up with the-rail terminals, so when you connect the rail to the mains you’re good to go. On the output of the breaker it’s common to use cable ducts to keep everything nice and tidy.

    EDIT: Found a picture:

      • halcyoncmdr@lemmy.world
        link
        fedilink
        English
        arrow-up
        5
        ·
        1 day ago

        Every building receives 240V and splits it into a pair of 120V phases. Three phase power is basically only installed at large industrial sites or very specialized shops.

        • fullsquare@awful.systems
          link
          fedilink
          arrow-up
          1
          ·
          edit-2
          1 day ago

          here if you need anything over certain power (6kW; depends on country i guess) you need a three phase installation, and even if you get single phase, it’s really handled as three phase split between single phase customers (a block gets three phase supply, then splits flats in three groups, each group gets connected to one phase). this gets supplied by a distribution transformer that might serve somewhere around 200 people per (in residential areas)

          i understand that sometimes americans also get distribution like this, with 208/120 three phase coming from substation, without 240v available