I joined Lemmy back in 2020 and have been using it as @[email protected] until somewhere in 2023 when I switched to lemmy.world. I’m interested in systemd/Linux, FOSS, and Selfhosting.

  • 99 Posts
  • 1.16K Comments
Joined 3 years ago
cake
Cake day: June 10th, 2023

help-circle

  • Our company still relies 100% on Azure and probably won’t switch anytime soon. Azure has now opened a partnership with an EU company to share code with them in case of a hostile government takeover (idea being that they could rebuild the cloud in the EU). This obviously purely symbolic and completely impractical measure was still enough for our company to cancel all plans to migrate away from Azure. It’s frustrating.


















  • For the people expecting this to be a CPU with a big-little architecture or NVIDA GPU, it was both.

    The Lenovo ThinkPad P1 Gen 8 review unit is equipped with an Intel Core Ultra 7 255H “Arrow Lake H” Processor, 64GB of LPDDR5-7467 memory, NVMe storage, and NVIDIA RTX Pro 1000 graphics. The Intel Core Ultra 7 255H consists of 16 cores between six P cores, 8 E cores, and two LPE cores. The Core Ultra 7 255H has a 28 Watt base power rating and 115 Watt maximum power rating.

    There used to be performance issues with mixed P and E cores and Linux, but I thought that was solved. Could that still be causing this discrepancy?